Wynn Atrium Displays

Wynn Las Vegas

We are proud of our floral project with artist Preston Bailey inside the Wynn Las Vegas Atrium. The spectacular hot air balloon and animated carousel floral installations were created with each flower individually applied.

AAA Call Center

Las Vegas, NV

This expansion uses reclaimed materials in its construction and is designed for energy efficiency.

Il Fornaio Restaurant

New York - New York, Las Vegas

Forte was happy to take part in the Il Fornaio project which included a new commercial kitchen and tenant improvements of dining room using upscale fixtures and glass storefronts.

Gordon Ramsay's Burgr

Planet Hollywood, Las Vegas

This contemporary space features a roaring flame theme with an undulating ceiling.Forte completed the $3.6 million build within 90 days of inception, while still shaving $500,000 from the original budget.

Heraea Restaurant

Palms, Las Vegas

As part of the Palms $50 million renovation, Heraea is an restaurant and sports lounge created by The ONE Group and themed after the first athletic competition for women in ancient Greece.

Eli Roth's Goretorium

The Strip, Las Vegas

Forte recently completed construction on this $6 million, 14,500-square-foot project. It is a year-round horror experience so there is a staggering amount of theme work and decorating.

Venetian Food Court

Venetian, Las Vegas

The hospitality industry doesn't like to be under construction for long, especially in their high-traffic areas. This project was perfect for Forte's skill set: efficient, themed elements and high standards.

Starbucks

Las Vegas, Nevada

Forte Specialty Contractors excels at building retail chain stores. Mixing general construction and themed elements falls in our sweet spot, allowing a higher than expected finish quality for the same budget.

Bourbon Room

Venetian, Las Vegas

Rock of Ages is coming to Las Vegas, and Forte built a space that allows you to live it. We are proud to have done an ode to the broadway show, which is coming to the Venetian later this year.

Dollheads

Miracle Mile Shops, Las Vegas

Dollheads was an extraordinarily short deadline project for a first-time construction client. Everything was finished in four weeks including demolition on the prior tenant's construction and fixtures.

Margaritaville

Flamingo, Las Vegas

Forte loves themed construction and what could be more fun than a Margaritaville? We found innovative ways to cut costs and speed up construction in order to finish on time and within budget.

Sushi Samba

The Palazzo, Las Vegas

Our team developed a process to cast the "ribbons" in gypsum. This not only met code requirements, but reduced the mold making cost by more than 60%, allowing all the ribbons to be produced within budget and the owner achieved their desired design.

90' ZODIAC DOME

Wynn Macau , China

Twelve sections open and close like an iris. Positioning had to be exact and we worked within very exacting weight requirements. Communication was critical as the mechanical team was in Canada, the design team was in England and final installation was in China.

Radio City Pizza

Tivoli Village, Las Vegas

Tivoli Village was opening in six weeks and many said the deadline was too near and the pizza joint would miss the Village grand opening. Forte found solutions to construction issues and finished in time for the festivities.

Hotel Expansion

Caesars Palace, Las Vegas

This fast-track project had a seemingly impossible ten-week deadline. A 24-hour production schedule resulted in one million dollars in cast product being completed on time. Importantly, we designed an attachment method to install material in record time.

Phantom theater

The Venetian, Las Vegas

The theater needed to be built faster than seemed possible and our clients' design intent had to be kept true while meeting their financial commitment. We accomplished all of the goals with the use of technology and good old fashioned ingenuity!

Exterior lights

Palms place, Las Vegas

The original design was too expensive and slow to install. Using lightweight composites and an internal structure resulted in a much lighter product which reduced installation, maintenance and construction costs. The original design intent was saved.

The Spa

Encore, Las Vegas

Forte is proud to have contributed to this Forbes five star, award-winning spa. The giant gold Buddha was sculpted by hand and we also fabricated and constructed the giant urns and statuary throughout.

Camacho's

Aliante Station, North Las Vegas

Our team took on the task of creating the complicated radius, perforated wall surrounding the bar. Forte is often brought in to plan and execute complicated elements within another company's project.